Pilot site 3: Cas Tresorer Station

Site 3 consists in a gas grid pressure reducing station located at the Cas Tresorer power station on the outskirts of Palma. This station will allow to inject H2 into the local gas distribution grid.

Initially the objective is injecting a mix of 2% (v) H2 into the local distribution natural gas grid, expected to increase to at least 4%(v) H2 over the course of the project timeframe.

The site is to be integrated with production capacity and distribution infrastructure from Site 1, with distribution/supply of H2 via tube trailers.

Discover the other Green Hysland project sites